WhatsApp quote guide

Choose the right WhatsApp conversation for your pool project

This page has no RFQ form and does not upload files. Choose the closest requirement, open WhatsApp and then attach your drawing, BOM, schedule or photos directly in the chat.

WhatsApp opens first. You can attach your drawing, BOM or project photos in the chat.

Technicians measuring a pool opening and marking dimensions on a plan
You build the pool. We coordinate the supply.Project supply configuration reference.

You build the pool. We coordinate the supply.

What contractors are really trying to avoid

Finding products is easy. The hard part is turning drawings, BOM lines and several factories into one package that arrives right, complete and on time.

Pool equipment, stainless fittings and long crates staged for container loading
Project supply configuration reference.
  1. The project risk01

    One project can mean chasing eight or more suppliers.

    How PoolProject reduces it

    We coordinate specialized factories through one China-side point of contact.

  2. The project risk02

    The lowest quote becomes expensive when voltage, sizing or connections are wrong.

    How PoolProject reduces it

    We organize drawings and BOM data, flag gaps and freeze approved specifications before production.

  3. The project risk03

    Fragmented replies slow down your quotation and tender.

    How PoolProject reduces it

    We structure the open questions, models, quantities, documents and lead times into one reviewable package.

  4. The project risk04

    Quality, missing parts and shipment readiness are hard to see from abroad.

    How PoolProject reduces it

    We define order-specific checks, evidence, packing records and consolidation before handover.

Where this service fits

  • A current automatic or manual pool-cover requirement
  • An equipment package supported by a BOM or schedule
  • Metal accessories or a consolidated multi-category project order
  • Replacement fabric, slats or spare parts for a cover already in service

What to prepare before WhatsApp

  1. 01Company type and project country or city
  2. 02Project type, stage and required date
  3. 03Chosen product scope, dimensions, quantities and electrical data where relevant
  4. 04The latest drawing, BOM, schedule or photos ready to attach in WhatsApp

Select the closest project requirement

Automatic or custom pool cover

Prepare the country, pool type, new-build or retrofit status, approximate size and available drawing or photos.

Pool equipment package

Prepare the project type, destination, voltage and frequency, then attach the current equipment BOM.

Ladders, handrails or metal accessories

Prepare the material, dimensions, quantity, water environment and a drawing or reference photo.

Consolidated project supply

Prepare the combined cover, equipment and accessory list, destination and required delivery window.

Replacement fabric, slats or spare parts

Prepare the existing cover dimensions, slat or fabric profile, motor model and photos. An order reference from a previous PoolProject shipment is enough to start.

How the project moves

  1. 1

    Choose one conversation

    Use the cover, equipment, accessory or consolidation entry so the first questions fit the requirement.

  2. 2

    Complete the prefilled context

    Replace the blank fields in WhatsApp and attach the project files there.

  3. 3

    Continue technical qualification

    PoolProject confirms missing inputs and whether the inquiry is ready for a structured quotation.

Scope and responsibility boundaries

  • Opening WhatsApp or sending a message is not acceptance of an order or a confirmed quotation.
  • This website does not receive, store or process drawings, BOMs, photos or RFQ submissions.
  • WhatsApp is a third-party platform with its own privacy terms and data handling.
  • Final price, specification, lead time, compliance and delivery terms exist only in the written quotation or contract.

Frequently asked questions

Does this page upload my drawing?

No. The CTA opens WhatsApp first; you attach the file manually inside the WhatsApp conversation.

Which option should I choose for a mixed order?

Choose consolidated supply when the project combines covers, equipment and accessories. You can clarify the category split in the message.

Is a WhatsApp reply a final quotation?

No. A final quotation should identify models or specifications, quantities, scope, exclusions, evidence, price, validity and delivery terms in writing.

Continue your project research

Select the closest project requirement

Each option opens the same PoolProject WhatsApp Business number with a different technical prompt and source code.

WhatsApp opens first. You can attach your drawing, BOM or project photos in the chat.