Automatic safety cover system

ShieldTrack ST3000: a safer close, specified for Gulf pools

A made-to-measure, track-guided automatic cover system built in our own factory for villa, compound, hotel and resort pools. Two installation paths — ST3000-U concealed under-track for new builds, ST3000-T surface-mounted top-track for selected retrofits — quoted from the pool drawing rather than length and width alone.

WhatsApp opens first. You can attach your drawing, BOM or project photos in the chat.

Track-guided automatic pool cover deployed across a Gulf villa pool
You build the pool. We coordinate the supply.Project supply configuration reference.

You build the pool. We coordinate the supply.

What contractors are really trying to avoid

Finding products is easy. The hard part is turning drawings, BOM lines and several factories into one package that arrives right, complete and on time.

Technicians measuring a pool opening and marking dimensions on a plan
Project supply configuration reference.
  1. The project risk01

    One project can mean chasing eight or more suppliers.

    How PoolProject reduces it

    We coordinate specialized factories through one China-side point of contact.

  2. The project risk02

    The lowest quote becomes expensive when voltage, sizing or connections are wrong.

    How PoolProject reduces it

    We organize drawings and BOM data, flag gaps and freeze approved specifications before production.

  3. The project risk03

    Fragmented replies slow down your quotation and tender.

    How PoolProject reduces it

    We structure the open questions, models, quantities, documents and lead times into one reviewable package.

  4. The project risk04

    Quality, missing parts and shipment readiness are hard to see from abroad.

    How PoolProject reduces it

    We define order-specific checks, evidence, packing records and consolidation before handover.

Where this service fits

  • New rectangular concrete pools with plan and section drawings available
  • Existing rectangular pools with adequate deck width and documented construction
  • Villa, compound, hotel and resort projects with a defined mechanism location
  • Contractors with a qualified local installation and commissioning team
  • Projects that can confirm power supply, service access and required documents

What to prepare before WhatsApp

  1. 01Pool plan and at least one edge section, with exact internal length and width
  2. 02New build or retrofit, plus deck, coping, step, spa and overflow details
  3. 03Preferred configuration: ST3000-U concealed, ST3000-T top-track, or a recommendation
  4. 04Project country and city, electrical supply and any required standards
  5. 05Slat or fabric colour preference and any chiller or heating equipment on the project

What ST3000 changes in Gulf operating conditions

A cover does not cool a pool. What it changes depends on the season and on the water-treatment equipment already in the project scope.

  • Water and dust, all year

    A closed, track-guided cover keeps most evaporation in and most airborne dust out of the water and off the filter. Because the benefit follows covered hours, a powered system earns its price where a manual cover is left open.

  • Summer, and the honest limit

    Specify an opaque fabric, never a transparent bubble cover. Water stays close to uncovered temperature while loss and dust load drop. On a chilled pool the cover reduces heat gain, so the chiller runs fewer hours.

  • Winter, inland especially

    From roughly November to March the classic case returns: on a heated pool the closed cover keeps heat in overnight and cuts heater running cost. Riyadh and other inland projects feel this more than the coast.

How the project moves

  1. 1

    Confirm the configuration

    Pool geometry, deck construction, track route, mechanism location, pit drainage and service access are reviewed before a configuration is proposed.

  2. 2

    Freeze the interface drawing

    Critical dimensions, fixing interfaces, power routing, controls and the responsibility split are approved in writing before production starts.

  3. 3

    Produce, inspect and ship

    The order is manufactured against approved information, checked for dimensions, components and identification, then packed and documented for export.

Scope and responsibility boundaries

  • An automatic cover is one additional layer of protection. It does not replace required barriers, fencing, supervision or local regulatory compliance.
  • The closed cover is not a walking surface or a substitute pool deck; any load-bearing statement requires documentation for the exact quoted configuration.
  • Professional local installation, electrical connection, commissioning and adjustment are required and remain with the buyer's qualified team.
  • Fabric grade, track alloy, drive architecture, certification and warranty terms are confirmed in the final written offer, not on this page.
  • Freeform geometry, raised spas, beach entries, infinity edges and perimeter overflow channels require individual technical review and may need a different cover approach.

Frequently asked questions

Can ST3000 be installed on an existing pool?

ST3000-T is intended for selected retrofits. Feasibility depends on pool geometry, deck strength and width, fixing points, access, power routing and available mechanism space, so send photos and deck details with the dimensions.

Is the concealed under-track version always better?

No. ST3000-U gives the cleanest finish but needs earlier structural coordination and more civil work. ST3000-T is often the practical route when the pool and deck already exist, with the mechanism left visible or housed under a bench.

Will a cover make the pool water hotter?

A transparent bubble cover will, which makes it the wrong product for a Gulf summer. An opaque cover blocks solar gain while it reduces evaporation, so water stays close to uncovered temperature. No cover cools a pool; on a chilled pool it lowers the chiller's running hours instead.

Can it be used on a freeform or infinity pool?

Rectangular pools are the most straightforward because the tracks must run parallel. Curves, raised spas, beach entries, infinity edges and overflow channels need individual review, and another cover approach is sometimes the honest answer.

How long does the fabric last in Gulf sun?

Fabric and slats are wear parts under high UV and heat, and no fixed interval is claimed here. Warranty terms, including any pro-rated period, are stated in the written offer. Because the system is our own production, we archive each order and can run the same profile again years later, so a replacement starts from the record instead of a re-survey.

Continue your project research

Start the ST3000 review with your pool drawing

Send the plan and section, internal dimensions, new-build or retrofit status and project city. We will identify the missing inputs and the preliminary configuration before anyone quotes a price.

WhatsApp opens first. You can attach your drawing, BOM or project photos in the chat.