Own-factory metal accessories · Project supply from China
Stainless-steel & aluminum pool accessories
Source pool ladders, handrails, anchors, tracks and rollers from our own factory for contractor projects and planned distributor orders. Send the accessory drawing, quantity and pool environment so we can review the material, fixing details and quotation scope.
WhatsApp opens first. Attach drawings, photos or your item list manually in the chat.

Choose the accessory you need
Start with the product family, then confirm its dimensions and installation interface. A reference photo helps identify the shape; the approved drawing defines the order.

Pool ladders
Specify the pool depth, deck profile, step arrangement, tube specification and anchor interface. For replacements, include photographs and dimensions of the existing sockets.
Review pool ladder requirements
Pool handrails
Send the stair profile, rail shape, fixing positions and finish reference. Confirm the base arrangement and supporting substrate with the local engineer before approving production.
Review pool handrail requirementsAnchors, tracks, rollers & related metal parts
Our metal-accessory range also includes cover tracks, rollers and anchors. Send the mating component or system reference, a dimensioned drawing and the quantity. Selected custom parts require feasibility review before quotation.
Match components to the pool-cover systemConfirm the material for the actual exposure
State the water treatment, salt use, coastal exposure and cleaning access before approving the grade. SS316 offers greater corrosion resistance than SS304, but it is not corrosion-proof.
| Material to review | Decision inputs | Dominant failure mode & prevention |
|---|---|---|
| SS304 | Decision inputsReview water chemistry, temperature and maintenance access for the selected item. | Dominant failure mode & preventionCorrosion staining or pitting: approve the grade and finish for the exposure and retain the cleaning instructions. |
| SS316 | Decision inputsReview more demanding exposure, including salt treatment; confirm suitability for the complete assembly. | Dominant failure mode & preventionPitting remains possible: review water management and finish, including welded areas, rather than relying on the grade name. |
| Aluminum components | Decision inputsConfirm alloy, surface treatment, mating parts and whether the component is wetted or exposed to splash. | Dominant failure mode & preventionCorrosion or interface deterioration: approve the surface protection and contact details for the selected application. |
If salt treatment or coastal exposure is involved, request an explicit material and finish review before accepting the item. Include fixings and mating parts in that review.
Material guidance: IMOA pool-design guidance, material selection and finish sections (pp. 2–5).
Match the fixing interface before production
Record the dimensions in millimetres and identify what each measurement refers to. Two accessories with similar shapes can have different fixing positions or tube sections.
When the accessory package includes suction outlets, coordinate their rated flow and concrete sump detail before casting. Check main drain flow rating, spacing and sump depth
A: distance between fixing centers
D: tube outside diameter
t: tube wall thickness
- Mark fixing centers, overall dimensions and the deck or stair profile on the drawing.
- State the tube section and finish, or identify them as awaiting confirmation.
- For replacement parts, show the existing socket or base, its dimensions and the mating part.
- Identify the substrate and local engineer’s fixing requirements; confirm whether anchors and fasteners are included.
If an existing fixing cannot be measured or identified, keep compatibility open until it is checked. A photograph alone does not establish fit.
Prepare the drawing for reviewCompare the complete supply scope
Compare quotations with the same inclusions. Missing anchors, finish requirements or packing protection can create extra purchasing and site work.
- Accessory body and finish: record the grade, dimensions, quantity and agreed drawing or sample revision.
- Fixings and local work: identify included sockets, bases and fasteners; allow separately for site verification and installation.
- Packing and freight: agree surface protection, package identification, delivery basis and any consolidation requirements.
- Future replacement: retain the approved drawing, mating-part reference, care instructions and written warranty terms.
Agree the evidence before ordering: dimensional checks, finish review and packing photographs, plus material or test documentation only where confirmed for the quoted item.
Send your accessory list for quotation
Send the information below for a project or planned distributor order. We review missing inputs before the specification and supply scope are agreed.
| What to send | Why we need it | Useful format |
|---|---|---|
| Product and quantity | Why we need itIdentify each order line and distinguish ladders, handrails and components. | Useful formatItem list with quantity per type |
| Drawing or reference | Why we need itCheck geometry, fixing positions and mating parts. | Useful formatDimensioned PDF or sketch; photos of existing parts |
| Material and environment | Why we need itReview grade, finish and actual exposure. | Useful formatRequested grade; treatment method; coastal or indoor setting |
| Destination and evidence | Why we need itReview packing, shipment scope and required documents. | Useful formatCity/country; requested material records or inspection evidence |
WhatsApp opens first. Attach drawings, photos or your item list manually in the chat.
Method and sources
This family guide uses our approved metal-accessory scope and project purchasing requirements. Material guidance follows IMOA’s Successful Stainless Swimming Pool Design (December 2005); the current OEM document linked below illustrates why an assembly needs separate component references. Sources checked 18 October 2026. Final dimensions, loading, fixing design and any certification require confirmation for the selected configuration; local measurement and installation remain with the buyer’s appointed team.
OEM assembly reference: ladder component-parts guide, January 2026 (PDF).